iii
Powerware 9315 Parallel Capacity/Redundant System with PHP SSBM
164201373 Rev. A 092402
Table of Contents
Introduction i...............................................
Basic System Configurations iii...................................
Using This Manual iv............................................
Conventions Used in This Manual v...............................
Safety C onsiderations vi.........................................
For More Information vii..........................................
Getting Help viii..................................................
Section I Installation
1
Getting Started 1---1..........................................
1.1 Installing the UPS 1---1......................................
1.1.1 Creating an Installation Plan 1---1.............................
1.1.2 Preparing Your Site 1---2.....................................
1.1.3 Environment Considerations 1---2.............................
1.1.4 Preparing for Wiring the Parallel Capacity/Redundant System 1---2
1.1.5 Inspecting and Unpacking Each Cabinet 1---3..................
2 Installing the Parallel Capacity/Redundant System 2---1.........
2.1 Preliminary Installation Information 2---1........................
2.2 Installing the Switchboard System Bypass Module 2---2..........
2.3 Installing Optional System Maintenance Bypass (SMB) 2---3......
2.4 Installing the Powerware Static Switch 2---4....................
2.4.1 Installing a Fully Rated Static Switch (4000A) 2---4...............
2.5 Installing SSBM or SMB Circuit Breakers 2---4..................
2.5.1 Installing an SSBM or SMB Circuit Breaker 2---4................
2.5.2 Setting the Power+ Trip Unit 2---5.............................
2.6 Installing UPM Cabinets 2---5.................................
2.7 Installing SSBM Wiring 2---5..................................
2.8 Installing Optional SMB Wiring 2---6...........................
2.9 Preparing for I nstalling Optional Accessories 2---6...............
2.10 Initial Startup 2---6...........................................
2.11 Completing the Installation Checklist 2---6......................
2.12 Installation Checklist 2---7....................................
3 Installing a Remote EPO Control 3---1..........................
4 Installing a Remote Monitor P anel 4---1........................
5 Installing a Relay Interface Module 5---1.......................
6 Installing a Supervisory Contact Module 6---1..................