RAD Data comm RIC-155 Network Card User Manual


 
Controls and Indicators 3-1
Chapter 3
Operation
This chapter provides the following information for the RIC-155 converter:
RIC-155 indicators
Turning-on and turning-off the RIC-155
Default settings.
Installation procedures given in Chapter 2 must be completed and checked before
attempting to operate RIC-155.
3.1 Turning On RIC-155
To turn on RIC-155:
Connect the power cord to the mains.
The PWR indicator on the front panel lights up and remains on as long as
RIC-155 receives power.
RIC-155 requires no operator attention once installed, with the exception of
occasional monitoring of front panel indicators. Intervention is only required when
RIC-155 must be configured to its operational requirements.
3.2 Controls and Indicators
The front panel includes a series of LED indicators that show the current operating
status of the unit. Figure 3-1 illustrates front panel of the RIC-155 unit. Table 3-1
lists and describes the indicator functions.
RIC-155
ALM
SPEED
LINK/ACT
SIG
MNG DATA 155 Mbps
10/100 BaseT
PWR
Figure 3-1. RIC-155 Front Panel