Test Program for Field.
90 Satellite L20 Maintenance Manual(960-Q01)
3.4 System Test
To execute the System Test select 01 from the Diagnostic Test Menu, press Enter and follow
the directions on the screen. The System Test contains two subtests. Move the highlight bar
to the subtest you want to execute and press Enter.
Subtest 01 FAN ON/OFF Checking
Select 1,2,3 to control FAN on/off , 1=Fan on , 2=Fan off , 3=Exit .
[EW5FAN.EXE] Program Version : 1.0
1: Fan On 2: Fan Off 3: Exit
Fan Status On FanRPM : 4250 or Fan Status OFF FanRPM : 0
Subtest 02 Battery Test
This will display battery information for check , press [ESC] to exit .
voltage : 16664 mV Remaining capacity alarm : 0 mAh
temperature : 29.4 ‘C Remaining time alarm : 10 min
current : 0 mA Battery mode : 0
average current : 0 mA AtRate : 0 mA
relative state of charge : 99 % At rate time to full : 65535 min
absolute state of charge : 99 % At rate time to empty : 65535 min
remaining capacity : 4074 mAh At rate O. K. : FFFF
full charge capacity : 4109 mAh Maximun error : 0 %
run time to empty : -1 min. Charging current : 0 mA
average time to empty : -1 min. Charging voltage : 0 mA
average time to full : -1 min. Manufacturer name : Panasonic
cycle count : 2 times Device name : PA3420U1BRS
design capacity : 4300 mAh Device chemistry : LION
design voltage : 14800 mV Manufacturer data : 0
specification information : 3.1 Manufacture date : 11/26/2004
serial no. : 4488
STATUS : INIT DISK FULL_CHG
Press [ESC] KEY to exit