Acer G610 Server User Manual


 
49
2 Insert the BPL5M hot-swap cage into the housing and secure it
with the two screws provided. The hot-swap cage will occupy
three 5.25-inch drive bays.
3 Attach the power cable, the SCSI terminator, the HDD fault LED
cable, and the mainboard connector cable to the backplane board
and attach the other end of the connector cable to the mainboard.
AA G600.book Page 49 Thursday, August 23, 2001 2:31 PM