Allied Telesis AT-iMG646BD-ON Network Card User Manual


 
Chapter 3: Installing the Enclosure
32 Section I: Outdoor Installation
Required Tools and Supplies
The following tools and supplies are required to install the enclosure:
Tools Have the following tools on hand before you install the enclosure or
gateway:
3/8” drill
Drill bit for the size of wall anchor or fastener you intend to use for the
enclosure
Flat head and #2 Phillips screwdrivers
SM fusion splicer and required fiber handling tools
9/32 in. and 3/8 in. nut drivers
Pliers
5/32 hex security driver
Additional
Supplies
You may also need the following supplies:
Mounting screws or bolts suitable for the mounting location and
material.
Silicone sealant
Electrical tape
A total of four UV-rated wire ties are recommended for the enclosure
and gateway installation
Fiber cleaning materials
One 1m SC/UPC SM pigtail
One SM fusion splice protector
One earth ground rod, if not already present
#6 gauge solid copper ground wire
Console cable (AT-RGCONSOLECABLE)
Power cable (AT-RG013-00)
Power supply (AT-iMG005G)