Installation Overview
Table 8 lists the installation procedures for the AT-DC2552XS L2 Data
Center Switch. The procedures should be performed in the order
presented in the table.
Table 8. Installation Procedures
Step Procedure
1 “Reviewing Safety Precautions” on page 35
2 “Planning the Installation” on page 39
3 “Unpacking the Switch” on page 40
4 “Installing the Switch on a Desktop” on page 44
OR
“Installing the Switch in an Equipment Rack” on page 45
5 “Installing Power Supply Module” on page 48
6 “Installing Fan Module” on page 52
7 “Installing SFP+ Transceivers and Cables” on page 56
8 “Installing QSFP+ Transceivers and Cables” on page 61
9 “Powering On the Switch” on page 66
10 “Managing the Switch” on page 69