Allied Telesis AT-PWR06 Switch User Manual


 
Stack Installation Guide for AT-2552XS L2 Data Center Switch
53
4. Tighten the captive screws to fasten the fan module to the chassis.
See Figure 23.
Figure 23. Tighten AT-FAN06 Captive Screws
5. Repeat steps 1 through 4 to install the second fan module into Fan 2
(right) slot.
Warning
To operate this product, two fan modules must be installed.
Operation of the AT-DC2552XS L2 Data Center Switch with one fan
module will cause the chassis to overheat.
6. The next step in the installation process is installing the SFP+
transceivers. Go to “Installing SFP+ Transceiver” on page 57 for the
installation procedure.