Pneumatic Step 15 - Cycle Data
Navigate to the Cycle Data tab.
Begin a weld cycle using the cycle activation switches.
• Inspect the weld results of your nished part on the
Cycle Data page.
• Review weld data to insure the process was done as
programmed.
• Values for the completed cycle should be displayed
under each programmed parameter.
Figure 4-40 below shows the top and bottom parts of the
Cycle Data page. Because all of the parameters will not
t on one page, move the scroll bar (right and/or left) at
the bottom to view the entire set of weld parameters.
NOTE
Use the scroll bar at the bottom of the
Cycle Data screen to display all of the
parameters.The bar moves the screen
image right and left because a typical
display will not show the entire set of
parameters at once.
Figure 4-40 iQ Explorer, Cycle Data Page
Parameters
Scroll Bar
Page 69
Dukane Manual Part No. 403-575-00
Section 4 - Operation
Dukane iQ Explorer - [Welder 1- Setup 4]