Procedure for Cycling
the System
1. Check that you have correctly performed the
following:
a. Installed the stack in the thruster and have closed
the stack access cover securely.
b. Secured the xture in place.
c. Performed the Operational Test of the Acoustic
Stack as detailed on Page 74 of this section.
2. Verify that all controls on the Press/Thruster and the
generator are set as required for this operation.
3. Place a part in the xture.
4. Cycle the system.
Activate both opti-touch switches at the same time
to start the system, and hold ngers in place until
the ultrasound starts. Releasing the ngers before
ultrasound starts will abort the cycle.
Page 77
Dukane Manual Part No. 403-575-00
Section 5 - System Operational Testing