GE EPM9450Q Network Card User Manual


 
149
Over Pickup for Over KW, Over Current, and Over Vunbal.
Time On for Over KW, Over Current, and Over Vunbal.
Time Off for Over KW, Over Current, and Over Vunbal.
The Setup 2 tab also provides push buttons for performing the following commands:
Download– Executes a script to check for values that have changed and downloads
those values to the device via the GE 7700 Gateway.
Refresh– .Executes a script to upload all of the meter values for the settings on the
screen.
Note: Be sure to click the Refresh button prior to changing or downloading any
settings to the EPM7700, as the latest settings may not be displayed.