Procedure 1: Prepare to Install the Hub 23
Installation
Procedure 1: Prepare to Install the Hub
Before installing the hub:
• Complete site-required arrangements for the hub.
• Make sure electrical power and temperature control requirements are met.
• Define a strategy for integrating the hub into an existing loop.
• Draw a map of all nodes to be connected to the hub.