IBM RS/6000 SP Switch User Manual


 
Step 0595-006
The supervisor self-test failed because the yellow LED flashed the wrong address.
1. Make certain that the correct supervisor harness connector is plugged into the supervisor.
2. Is the correct harness plugged in?
v If yes, go to the Start MAP (0100) in the
RS/6000 SP: System Service Guide
and troubleshoot the
supervisory bus system.
v If no:
a. Plug in the correct supervisor connector.
b. Return to “Step 0590-002” on page 1-4 and confirm the original conditions.
Step 0595-007
The supervisor self-test failed because the yellow LED was on steady. This indicates that the supervisor is
operating with base code only and needs to have the correct application code loaded.
Note: If the replacement supervisor card is new or it has the wrong application code, the self-test will fail
at the last step and the yellow LED will remain on.
1. Perform the SP Switch2 Base code verification procedure on 3-8.
2. Based on the information returned from the Base code verification, perform the procedure for
“Updating the SP Switch2 supervisor code” on page 3-8.
3. After updating the supervisor code, perform the “SP Switch2 supervisor self-test” on page 3-6.
4. Does the supervisor pass the self-test?
v If yes, go to “Step 0595-010”.
v If no, go to the Start MAP (0100) in the
RS/6000 SP: System Service Guide
and troubleshoot the
supervisory bus system.
Step 0595-008
You replaced an SP Switch2 supervisor card.
1. Reconnect the supervisor harness to the connector at the back of the SP Switch2.
v Reconnecting the harness initiates the supervisor self-test.
2. Do the green and yellow LEDs light?
v If yes, go to “Step 0595-009”.
v If no, go to the Start MAP (0100) in the
RS/6000 SP: System Service Guide
and troubleshoot the
supervisory bus system.
Step 0595-009
You replaced a supervisor card and the green and yellow LEDs lit during the self-test.
1. Rerun the “SP Switch2 supervisor self-test” on page 3-6.
v While the test is running, compare the LED conditions on the supervisor with those listed in the
Self-test Conditions table.
2. Did the supervisor pass the self-test?
v If yes, go to “Step 0595-002” on page 1-7.
v If no, go to “Step 0595-003” on page 1-7.
Step 0595-010
1. Refresh Perspectives
2. Power on the switch.
3. Does Perspectives indicate that the problem is still present?
v If yes, return to the Start MAP (0100) in the
RS/6000 SP: System Service Guide
.
v If no, go to the End of call procedures (MAP 0650) in the
RS/6000 SP: System Service Guide
.
Switch supervisor communications (MAP 0595)
1-8
RS/6000 SP: SP Switch2 Service Guide