IBM RS/6000 SP Switch User Manual


 
Figures
1-1. SP Switch2 Assembly High-Level Diagram ....................1-3
1-2. SP Switch2 Wrap Plugs ...........................1-5
1-3. SP Switch2 Chassis Assembly ........................1-11
2-1. Front view of frame locations .........................2-3
2-2. Front view of multi-switch frame locations ....................2-4
2-3. Rear view of frame locations .........................2-5
2-4. SP Switch2 high level planar view .......................2-7
2-5. RS/6000 SP connector details (as seen at receiving ends, not at cable ends) .......2-8
2-6. Frame cabling routing path in rear of RS/6000 SP frame 1.93 m frame ........2-9
2-7. Frame cabling routing path in rear of RS/6000 SP frame 2.01 m frame ........2-9
2-8. Frame cable routing paths in rear of RS/6000 SP multi-switch frame (F/C 2032) 1.93 m
frame .................................2-11
4-1. Handling an anti-static device.........................4-2
4-2. Removing SP Switch2 fan assemblies and power supplies ..............4-3
4-3. Removing SP Switch2 power and environmental LED assembly ............4-4
4-4. Removing and replacing SP Switch2 supervisor and interposer cards ..........4-5
4-5. Installing an SP Switch2 supervisor and interposer cards ..............4-6
4-6. Removing SP Switch2 circuit breaker assembly ..................4-9
© Copyright IBM Corp. 2000, 2002 v