Liebert DS Network Card User Manual


 
Piping Schematics
104
Figure 79 Primary connection locations—upflow, water/glycol/GLYCOOL, 53-77kW (15-22 ton), all
compressor models
Point Description
X
inches (mm)
Y
inches (mm)
Connection Size / Opening
inches (mm)
W1 Water/Glycol/GLYCOOL Access (Bottom)
102-15/16 (2615) 9 (229) 3-1/2 x 8 (89 x 203)
W2 Water/Glycol/GLYCOOL Access (Top)
102-15/16 (2615) 9 (229) 3-1/2 x 8 (89 x 203)
W3 Water/Glycol/GLYCOOL Access (Side)
- - 6 x 17-3/16 (152 x 437)
WS Water/Glycol/GLYCOOL Supply
- - 2-1/8 Cu Sweat
WR Water/Glycol/GLYCOOL Return
- - 2-1/8 Cu Sweat
CGD* Condensate Gravity Drain
- - 3/4 FPT
CPD Condensate Pump Discharge (Option)
79-5/16 (2015) 11-7/8 (302) 1/2 Cu Sweat
HUM Humidifier Supply Line
79-5/16 (2015) 9-7/8 (251) 1/4 Cu Sweat
ECS** Econ-O-Coil Supply
78-5/8 (1998) 7-7/8 (200) 2-1/8 Cu Sweat
ECR** Econ-O-Coil Return
78-5/8 (1998) 4-5/8 (117) 2-1/8 Cu Sweat
E1 Electrical Connection (High Voltage)
75-3/8 (1915) 30 (762) 2-1/2
E2 Electrical Connection (High Voltage)
69-7/8 (1775) 30 (762) 2-1/2
LV1 Electrical Connection (Low Voltage)
19-1/2 (495) 29-1/16 (738) 7/8
LV2 Electrical Connection (Low Voltage)
19-1/2 (495) 30-1/2 (775) 7/8
LV3 Electrical Connection (Low Voltage)
19-1/2 (495) 31-15/16 (811) 7/8
* Field-pitch condensate drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory-installed condensate trap. Do not
trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply with all
local codes.
** Supplied on Dual-Cool systems only (4-pipe system)
DPN001214
Rev. 1
Front
W3
WS
WR
CGD
CGD*
Top View
Left Side Section View
Front Section View
(Left Front Panel Not Shown)
8"
(203mm)
6"
(152mm)
3-7/8"
(98mm)
17-3/16"
(437mm)
Blower
Outlet
Blower
Outlet
35"
(889mm)
2-7/8"
(73mm)
3-1/2"
(89mm)
LV1
LV2
LV3
14-1/4"
(362mm)
15-7/8"
(403mm)
All dimensions from
rear corner of unit
including panels
NOTE
1. Drawing not to scale.
2. Tolerance on all piping dimensions
is ±1/2" (13mm).
3. Field-routed alternatives for water/glycol
connections.
4. See submittal page DPN001191 for
blower outlet and deck dimensional data.
4 4
3
3
3
3
3
3