6
6.3 Job Control Screens
6-18 CF2002/CF3102
Controlling Jobs Chapter 6
To combine jobs
1
Select the job that you wish to combine other jobs with.
2
Select the jobs that you wish to combine with the first job selected.
❍
To combine more than two jobs, repeat the above step until all jobs that you
wish to combine are selected.
❍
Up to five jobs can be selected.
❍
To change any of the copy settings, touch [Change Mode], and then change
the settings.
3
Touch [OK]. The jobs are deleted from the list on the Combine Jobs screen.
The Print List screen of Job Log appears.
❍
The selected jobs are combined into one.
4
On the Print List screen, check the status of the jobs.