NEC NEAX2400 Network Cables User Manual


 
ND-70185 (E) CHAPTER 6
Page 139
Revision 3.0
POST INSTALLATION TEST
FCCS Network Connection Test
STEP 4: The call terminates on STN B.
STEP 5: Confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 6: Replace the handset of STN A.
STEP 7: Repeat the above steps for all Fusion links.
3.1.2 FCCS Call Termination Test
STEP 1: Using the MBCT command, make busy all trunks in the origination route except the trunk to be tested
at Node B.
STEP 2: Lift the handset of STN B in Node B.
STEP 3: Dial a Telephone Number (STN A) which belongs to the self-node.
STEP 4: The call terminates on STN A.
STEP 5: Confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 6: Replace the handset of STN B.
STEP 7: Repeat the above steps for all Fusion links
.
Figure 6-8 Station-to-Station Connection Test (origination) via FCCS
Check
LC
LC
RG
FCCS
STN A STN B
Node A (Self-Node) Node B
.....
.....
Call Origination
B ch: busy
B ch: busy
B ch: busy
B ch: idle
MBCT Command
0: Make idle
1: Make Busy
(Make Busy Information)
TELN: 410000
STN: 2000
TELN: 420000
STN: 2000
Dial TELN
"420000"
R
I
N
G
I
N
G
Note:
Using the MBCT command, make busy all B-channels in the route except the trunk to be tested.