Paradyne 1900 Network Card User Manual


 
2. BitStorm 1900 Installation and Testing
2-96 BitStorm 1900 Installation and Maintenance Guide 1900-A2-GN20-00
Task 014: Testing the BitStorm 1900 Installation
Testing a BitStorm 1900 installation includes the following tasks:
Testing voice connectivity
Testing data connectivity
End-to-end connectivity
The following sections contain testing-related information followed by
the BitStorm 1900 testing tasks. Testing tasks for network support
equipment such as LAN/WAN routers are not included in this
document.
BitStorm 1900 Testing Locations
Primary test points for installation include the following:
Customer premises cross-connect containing the connections for
the BitStorm 1900 and customer premises equipment
Modem user locations
If the system is having trouble, other test points may be required.
Step Procedure
1.) Review the BitStorm 1900 Test Point Diagrams as follows:
Figure 2-21, "Voice/Data System Test Points," on page 97
shows the schematic layout and primary test points of a
BitStorm 1900 voice/data system.
Figure 2-22, "Data-only System Test Points," on page 98 shows
the schematic layout and primary test points of a BitStorm 1900
data-only system.