Paradyne 1900 Network Card User Manual


 
2. BitStorm 1900 Installation and Testing
1900-A2-GN20-00 BitStorm 1900 Installation and Maintenance Guide 2-35
Installation Task List
The following is a complete list of all tasks to perform. To install the
BitStorm 1900 complete each task in the order given.
Installing the BitStorm 1900
The following tasks and procedures have been provided to properly
install the BitStorm 1900 components. The installation is organized
into numbered tasks with each task containing all of the procedural
steps for completion. Complete each task in the order given and
complete each step for a task procedure in the order given before
continuing on to the next task.
Task # and Description Page
Task 001: Pre-Installation Checklist 36
Task 002: Installing the 19” Fan Tray 38
Task 003: Installing the BS1900 and Filter Shelves 42
Task 004: Installing the Air Baffle 47
Task 005: Installing the Circuit Packs 48
Task 006: Connecting Power to the Shelf 49
Task 007: Installing the Data Network Connection with an MIU 54
Task 008: Installing Voice/Data & Filter Shelf Connections 58
Task 009: Installing Voice/Data w/Filter 66-Block Connections 64
Task 010: Installing the Data-only Connections 67
Task 011: Installing External Voice Switch Connections 70
Task 012: Configuring the MIU 72
Task 013: Configuring Remote Management 87
Task 014: Testing the BitStorm 1900 Installation 96
Task 015: Testing Voice Connectivity 99
Task 016: Testing Data Connectivity 100
Task 017: EtherLoop End-to-End Testing 101