Paradyne 1900 Network Card User Manual


 
2. BitStorm 1900 Installation and Testing
2-34 BitStorm 1900 Installation and Maintenance Guide 1900-A2-GN20-00
Installation Flowchart
Figure 2-1, "BitStorm 1900 Installation Flowchart." provides a visual
flowchart of the BitStorm 1900 installation process as a reference tool.
Figure 2-1: BitStorm 1900 Installation Flowchart
Verify
Rack
Space,
Power and
Grounding
Install BitStorm 1900
Chassis directly on top
of Fan Tray or 1 RU
from bottom of rack
Install Fan Tray
(leave 1RU of space
below for proper air flow).
Verify Power Card is
260W.
Are you
Installing an
AC or DC Power
Card
?
Install -48VDC
Power Source
Install Air Baffle
On Top
Are you
using a Filter
Shelf
?
Install
Filter Shelf(s)
on top of BitStorm
1900 Chassis
Install appropriate
cards into the
BitStorm 1900
Verify Power and
Connect to
BitStorm 1900
Install appropriate
Ethernet data
connects to
the MIU
Install Interconnecting
cables to the Filter
Shelf. Refer to
Appendix B for various
configurations
Are you
using a Filter
Shelf
?
Install
Interconnecting
cables to the
BitStorm 1900
Install
Interconnecting
cable to the MD
F
Yes
No
Yes
Install Interconnecting
cable between the Filter
Shelf and BitStorm 1900.
Refer to Appendix B for
various
configurations
AC
No
Turn Power
On
Install
Rack and
Connect to
Building
Ground
Verify AC Power is
Available
DC
Install
Power
Strip
Install
MIU
Card
Test System
Configure the MIU
and Remote
Management
SNMP
End
Start
02-17173