2. BitStorm 1900 Installation and Testing
1900-A2-GN20-00 BitStorm 1900 Installation and Maintenance Guide 2-37
Step Procedure (continued)
5.) Verify all necessary BS 1900 system components, hardware,
circuit packs, and cables are at the installation site and that they
are in good condition. If a Materials List is provided, verify the
packing list with it.
6.) Determine if an AC or DC power card is to be used in the
configuration.
a.) If installing a DC power card, install the -48 V DC power
source.
7.) Complete all remaining tasks in the order given unless otherwise
directed.
STOP
<RXKDYHFRPSOHWHGWKLVWDVN