Sony Bznp-D1 Printer User Manual


 
51
Schedule Preparations
Chapter 4 Routine Operations
Periodic schedules case A
Periodic schedules case B
To check the priority on an NSP-1, click the NSP-1
(Remote Control) option button in the BZNP-D1 main
window, select the desired NSP-1 in the NSP-1 drop-down
list box, then click [Update].
After the Updating Information window is displayed, the
list in the Content Management window shows the
contents stored on the selected NSP-1. The periodic
schedule that has been sent most recently, and hence has
the highest priority, is displayed at the top of the list.
Specifying a non playout period
Periods when no playout will be done on the NSP-1 can be
scheduled for each NSP-1 group, in the same manner as
the playout periods.
The non playout periods have higher priority than any
playout periods, regardless of the transferred order. You
can specify them in advance.
Note however, that playout will not be done on these non
playout days even if you send periodic schedules in which
the same days are specified as the playout period.
1
In the BZNP-D1 main window, check that the BZNP-
D1 (PC) option button is selected, and select the group
for which you want to create a new periodic schedule
with a non playout period using the Group drop-down
list box.
2
Select the Periodic Schedule tab of the Content
Management window, right-click any point on the tab,
then select [New] on the popup menu.
The Edit Periodic Schedule dialog box appears.
3
Select the No Playout option button, and specify the
first and last days of the non playout period.
Clicking the button of the drop-down list box displays
a calendar. The date you click on the calendar will be
specified in the drop-down list box.
4
Place check marks for the days in the Day of the Week
check boxes to specify specific days of the week in the
period.
You can click each check box separately, or use the
[Check All] or [Clear All] button.
To specify the Mondays in a period as non playout
days, for example, click [Clear All], then click the
Monday check box.
5
Click [OK].
A new periodic schedule for a non playout period has
Start date End date Daily schedule
index
Transferred
at:
07/01/2004 08/15/2004 051000001 06/30/2004
10:00:00
08/01/2004 08/02/2004 051000002 06/30/2004
11:00:00
Start date End date Daily schedule
index
Transferred
at:
08/01/2004 08/02/2004 051000002 06/30/2004
10:00:00
07/01/2004 07/15/2004 051000001 06/30/2004
11:00:00
Hint
Note