8
Operational Flow
Chapter 1 Overview
Operational Flow
Upon System Installation
The following flowchart shows an example of the
operations required when the system is installed:
During Routine Operation
The following flowchart shows an example of the routine
operation of this system after you have finished system
installation:
Set up the NPS-1 using
web access.
(Refer to the operating
instructions of the NSP-1.)
Make the BZNP-D1 system setup
items.
z
Specify the material types to
be used.
z
Specify the video format.
Register the NSP-1 players.
Group the registered NSP-1 players,
and create screen layout templates.
Prepare materials
z
Register video, graphics, Flash, and audio
files.
z
Create or register text material.
z
Register the URL of web pages.
z
Register additional control commands.
Create playlists (programs)
z
Specify a destination NSP-1 group, and then
create a playlist for it.
z
Add materials to a playlist according to the
playout order.
Create a daily schedule
Use a playlist and the control commands of
a PDP or other device to create a schedule.
Specify the playout date (Create a calendar)
Specify the period when the daily schedule
created is to be used.
Transmission
Send a calendar to an NSP-1 group.
Materials, playlists, and daily schedules are
simultaneously transmitted.
Check the transmission status
Check the status of the transmission, if necessary.
Check the NSP-1 status
Check the status of the NSP-1, playout schedules,
and results, if necessary, using a web browser
that can be started from the BZNP-D1 software.