TNETX4090
ThunderSWITCH II
9-PORT 100-/1000-MBIT/S ETHERNET
SWITCH
SPWS044E – DECEMBER 1997 – REVISED AUGUST 1999
64
POST OFFICE BOX 655303 • DALLAS, TEXAS 75265
GMII (port 8)
Figures 18–20 show the timing for the 100-/1000-Mbit/s GMII when operating at 1000 Mbit/s.
Both Mxx_CRS and Mxx_COL are driven asynchronously by the PHY. Mxx_RXD7–MxxRXD0 is driven by the
PHY on the falling edge of Mxx_RCLK. Mxx_RXD7–MxxRXD0 timing must be met during clock periods in which
Mxx_RXDV is asserted. Mxx_RXDV is asserted and deasserted by the PHY on the falling edge of Mxx_RCLK.
Mxx_RXER is driven by the PHY on the falling edge of Mxx_RCLK.
GMII receive (see Figure 18)
NO. MIN MAX UNIT
1 t
su(Mxx_RXD)
Setup time, Mxx_RXD7–Mxx_RXD0 valid before Mxx_RCLK↑ 2 ns
1 t
su(Mxx_RXDV)
Setup time, Mxx_RXDV valid before Mxx_RCLK↑ 2 ns
1 t
su(Mxx_RXER)
Setup time, Mxx_RXER valid before Mxx_RCLK↑ 2 ns
2 t
h(Mxx_RXD)
Hold time, Mxx_RXD7–Mxx_RXD0 valid after Mxx_RCLK↑ 1 ns
2 t
h(Mxx_RXDV)
Hold time, Mxx_RXDV valid after Mxx_RCLK↑ 1 ns
2 t
h(Mxx_RXER)
Hold time, Mxx_RXER valid after Mxx_RCLK↑ 1 ns
Mxx_RXD7–Mxx_RXD0
Mxx_RXDV
Mxx_RXER
1 2
Mxx_RCLK
Figure 18. GMII Receive
Mxx_CRS and Mxx_COL are driven asynchronously by the PHY. Mxx_GTCLK is derived directly from
Mxx_RFCLK. Mxx_TXD7–Mxx_TXD7 is driven by the reconciliation sublayer synchronous to the Mxx_GTCLK.
Mxx_TXEN is asserted and deasserted by the reconciliation sublayer synchronous to the Mxx_GTCLK rising
edge. Mxx_TXER is driven synchronous to the rising edge of Mxx_GTCLK.
GMII transmit (see Figure 19)
NO. MIN MAX UNIT
1 t
d(Mxx_TXD)
Delay time, from Mxx_GTCLK↑ to Mxx_TXD3–MxxTXD0 valid 1.5 4.5 ns
1 t
d(Mxx_TXEN)
Delay time, from Mxx_GTCLK↑ to Mxx_TXEN valid 1.5 4.5 ns
1 t
d(Mxx_TXER)
Delay time, from Mxx_GTCLK↑ to Mxx_TXER valid 1.5 4.5 ns
Mxx_TXD7–Mxx_TXD0
Mxx_TXEN
Mxx_TXER
1
Mxx_GTCLK
Figure 19. GMII Transmit