Toshiba Z300 Server User Manual


 
Installing and Removing Hardware
CPU module
78
6 Install the power supply unit.
See “Power Supply Unit” on page 69
7 Fit the server panels and outer covers to the server.
8 Connect the power cable of the server to the power supply and
switch on the server
CPU module
The server is classified into 2 models, each having different CPU
clock speeds (866 MHz, 1 GHz). If two processors are installed in
your server, the server is transformed into an upgraded version
(two CPUs max.). Please note that only CPUs with the same
clock speed can be installed together. There is a socket (No. 2
socket) for installing an expansion CPU.
To install a CPU with a different processing speed, it is necessary
to remove and replace all current CPUs with others with the same
processing speed.
CPU socket
WARNING: When installing a peripheral unit, don't open any
part other than those specified by the instructions. If an
unspecified part is opened, it may cause an electric shock.
CPU socket 2
CPU socket 1
(standard)