3Com 6416SW Network Card User Manual


 
Phase 2: Problems During ATM Configuration
The problems in this phase occur after you turn ON the ONcore hub and the 6416SW
ACTIVE LED lights ON (yellow). This indicates that the 6416SW module is ready to
control the ATM subsystem.
Phase 2 problems concern the configuration tasks described in Chapter 5, “Configuring
the ATM Switch/Control Module” on page 5-1 and are divided as follows:
Problems concerning the operation of the 6416SW console
Problems concerning the configuration of 6416SW and ATM media modules
Problems concerning the configuration of ATM media ports.
After you solve Phase 2 problems, the status of all ATM media ports (as displayed with
the SHOW PORT command) should be NO ACTIVITY. There are still no ATM devices or
external wrap plugs attached to the ports.
If you cannot solve a Phase 2 problem and if the status of an ATM media port does not
change to NO ACTIVITY, contact an 3Com service representative before attaching an
ATM device.
7-10 ONcore ATM Switch/Control Module: Installation and User's Guide