3Com WL-560 Network Router User Manual


 
10 CHAPTER 2: INSTALLING THE BRIDGE
Figure 3 shows the front view of the Bridge, including the LEDs and
connecting ports. It also shows the cradle, which is used to mount the
Bridge to a wall or to install the Bridge on a flat surface.
Figure 3 Bridge
Observing Safety
Precautions
This equipment must be installed in compliance with local and national
building codes,
regulatory restrictions, and FCC rules. For the safety of
people and equipment, only professional network personnel should
install the Bridge.
WARNING: To comply with FCC radio frequency (RF) exposure limits, a
minimum body-to-antenna distance of 20 cm (8 in.) must be maintained
when the Bridge is operational.
WARNING: To avoid possible injury or damage to equipment, you must
use either the provided power supply or power supply equipment that is
safety certified according to UL, CSA, IEC, or other applicable national or
international safety requirements for the country of use. All references to
power supply in this document refer to equipment meeting these
requirements.
CAUTION: The 3Com power supply (part number 61-0107-000) input
relies on a 16A rated building fuse or circuit protector for short circuit
protection of the line to neutral conductors.
11
a
/
b
/
g
W
i
r
e
l
e
ss
W
o
r
k
g
r
oup
B
r
idg
e
P
ow
e
r
P
o
r
t
S
e
r
i
a
l
P
o
r
t
E
th
e
r
n
e
t
P
o
r
t
C
r
a
dl
e