Allied Telesis X600-24TS/XP Switch User Manual


 
x600 Layer 3 Gigabit Ethernet Switch Installation Guide
83
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up.
4. Slide the transceiver into the slot until it clicks into place. See Figure
41.
Figure 41. Installing an SFP Transceiver
5. For the x600-24Ts and x600-24Ts/XP switches, verify that the handle
on the SFP transceiver is in the upright position, as shown in
Figure 42, to prevent inadvertently removing the transceiver.
Figure 42. Positioning Handles on the x600-24Ts and x600-24Ts/XP
Switches
1331
23R
24R
CLASS 1
LASER PRODUCT
D/C
L/A
1000 LINK / ACT
FDX
PORT A
C
SFP
21 22
23
24
1331
23R
24R
CLASS 1
LASER PRODUCT
D/C
L/A
1000 LINK / ACT
FDX
PORT A
C
SFP
21 22
23
24