APC AP89XX Power Supply User Manual


 
60Switched Rack PDU User Guide
Configure the Name and Location of the Rack PDU
Path: Device Manager > Device Load
The name and location you enter appear on the Home tab.
Note: You can set the Name and Location through either the Device Manager tab or the Administration
tab. A change in one affects the other.
1. Click the Device Manager tab, then device load from the Load Management menu.
2. Enter a name and location.
3. Click Apply.
Set the Coldstart Delay for the Rack PDU
Path: Device Manager > Device Load
The Coldstart Delay is the number of seconds added to each outlet’s Power On Delay before an outlet
will turn on after power is applied to the Rack PDU. Allowed values are from 1 to 300 seconds,
Immediate, or Never (never turn on).
1. Click the Device Manager tab, then device load from the Load Management menu.
2. Make a selection for Coldstart Delay.
3. Click Apply.
Reset Peak Load and kWh
Path: Device Manager > Device Load
1. Click the Device Manager tab, then device load from the Load Management menu.
2. Click the Peak Load and Kilowatt-Hours check boxes as desired.
3. Click Apply.