Cisco Systems 124778 Power Supply User Manual


 
2-8
Cisco AC/DC Power System User Guide, R1.0
May 2006
Chapter 2 System Installation
2.2.2 Install the 1 RU Distribution Shelf
Figure 2-7 1 RU Distribution Shelf Alarm Cabling
2.2.2.2 Install the DC Power Cabling (Optional)
If the system is equipped with the 1 RU Distribution Shelf, follow the instructions below. For systems
without the 1 RU Distribution Shelf, skip this procedure and go to the “2.2.3 Install the Ground Cable”
procedure on page 2-9.
Step 1 Locate the four 6AWG (16mm²) power cables provided at the rear of the system shelf (on top of the
system shelf in preinstalled systems). These are terminated with Anderson Powerpole™ Connectors (to
install these connectors, remove the heat shrink from the ends of the connector).
Step 2 Connect to the appropriate connection points on the 1RU Distribution Shelf labeled load (-48V) and
return (RETURN) (Figure 2-8).
Note Anderson Powerpole™ Connectors are keyed and can only be inserted one way. If the connector
does not insert easily into the mount, make certain that the connector is being inserted with the
key side up.
124758