Emerson 540VDC Power Supply User Manual


 
Installation
23
11. Insert and begin tightening two (2) hex head bolts with one washer each through bracket
mounted at front of cabinet into anchor inserts in mounting surface (see Figure 23).
Figure 23 Mounting front bolts—front side of cabinet
12. Check the bubble level on the floor of the cabinet on the right hand side of the Power Conversion
Module (see Figure 24). The Liebert FS is sufficiently level when the bubble is within the outer of
the two circles. If the bubble is outside the outer circle, use the leveling feet to adjust until bubble
is within the outer circle.
Figure 24 Bubble level
13. Once the cabinet is level, firmly tighten the front bolts to drop-in anchors as shown in
Figure 134. The front bolts must be tightened to 40 foot-pounds (54 N-m) of torque.
Bubble
level
DISCONTINUED
PRODUCT