This section describes the installation of the Topaz S3 0.5
kVA, 1 kVA, & 2 kVA including receiving, handling, storage,
and installation procedures.
Before accepting the shipment from the freight carrier,
inspect the exterior surfaces of all shipping containers or
packaging used, and the equipment, for damage that may
have occurred during transit. If the shipping containers or
equipment show evidence of damage, note the damage on
the receiving document (bill of lading) prior to signing for
receipt of equipment.
Damage claims should be filed directly with the carrier.
Replacements for damaged components should be ordered
through MGE Customer Support Services, @ 1-800-523-
0142 ext. 476.
No special handling required.
If the equipment is to be stored prior to installation, it should
be stored in a cool, dry, well-ventilated location that is
protected against rain, splashing water, chemical agents, etc.
The equipment should be covered with a tarpaulin or plastic
wrapper to protect it against dust, dirt, paint, or other foreign
materials.
An efficient Topaz S3 installation depends on careful
planning and site preparation. Installation of static inverter
equipment must be handled by skilled technicians and
electricians familiar with the special requirements of high-
energy electrical equipment. The installation must comply
with the requirements of the National Electrical Code (NEC,
ANSI/NFPA 70, latest issue) and with local codes and re-
quirements as applicable.
We strongly recommend contacting MGE Customer Support
Services @ 1-800-523-0142 ext. 476 for system start-up. Do
not allow unqualified personnel to handle, install, or operate
the Topaz S3 inverter.
2.5 Installation
2.4 Prerequisites to
Installation
2.3 Storage
2.2 Handling
2.1 Receiving
2.0 Scope