Paradyne 8779 Network Router User Manual


 
A. Configuration Options
8700-A2-GB20-40 May 2002
A-39
Configuring and Testing Inband Management
The Model 8779 Termination Unit allows you to set up remote inband
management using one of the DS0 channels as the management channel to
transport SNMP traffic to the MCP card.
Procedure
To set up inband management for the 8779 unit:
1. Ensure that MCP card is operating with firmware release M04.03.19 or later
and that the 8779 unit is operating with firmware release A02.03.22 or later.
2. Configure the MCP card for inband management using a console session (not
Telnet session). From the MCP card, follow this menu selection sequence:
Main Menu
Configuration
Ports
Ethernet Port
The Ethernet Ports screen appears.
3. Enter
Internal
for Management Port Type and the slot number of the 8779 unit
to be tested for Management Port Card/Slot #. Then Enter
yes
to reset the
port and save your changes.
4. Use the Cross Connect Mode screen on the 8779 unit to configure the G.703
port to be used for inband management as a DS0 cross-connection. From the
8779 unit, follow this menu selection sequence:
Main Menu
Configuration
Current Configuration
Cross Connect
Set Cross Connect Mode