Paradyne 8779 Network Router User Manual


 
8. Testing
8-10
May 2002 8700-A2-GB20-40
Ending an Active Test
Except for the Remote Send Line Loopback, a test initiated by the user can be
ended by the user with the following methods:
Test Timeout option
Enable the Test Timeout system option so the unit can
automatically terminate tests, and set the Test Duration (min) option to specify
the amount of time that tests can run before the unit terminates the test. The
default is 10 minutes. Refer to Table A-7, System Options, in Appendix A,
Configuration Options
.
Command column
Under the Command column on any test screen,
position the cursor at Stop next to the active test and press Enter to stop a
specific test.
Abort All Tests menu selection
Select Abort All Tests from the Test menu
to stop all tests running on all interfaces.
Command
Complete
appears
when all tests on all interfaces have been terminated. Network-initiated
loopbacks cannot be stopped from the Test menu.
An aborted test may continue to run for a few seconds as the Stop command is
sent to the remote end and processed.