Promise Technology M210p Computer Hardware User Manual


 
VTrak M310, M210p Product Manual
214
Cache policy is in
writeback mode without
battery
Install or replace the battery. See page 175.
Blowers
Blowers have started Normal.
Blowers have stopped Verify that the cooling unit is properly installed. If the
blower still does not turn, replace the blowers. See
page 172.
Blower speed is
increased
Check the VTrak for overheating. See page 231.
Blower speed is
decreased
Temporary overheat condition was corrected.
Blowers are NOT
functioning
Replace the blowers. See page 172.
Blowers have been
inserted
Normal.
Blowers have been
removed
Reinstall the cooling unit(s). If the blowers does not
turn, replace the blowers. See page 172.
Blowers are functioning
normally
Normal.
Blowers are NOT installed Reinstall the cooling unit(s). If the blowers does not
turn, replace the blowers. See page 172.
Blower status is unknown Check for airflow out of the cooling unit. If there is
none, check for proper installation.
Cache
BBU flushing has started VTrak’s cache is being flushed.
BBU flushing has ended VTrak’s cache has been flushed.
BBU flushing has failed VTrak’s cache could not be flushed. Check your
cache flush interval setting. See page 80.
Controller
The controller
parameter(s) changed by
user
The user successfully change controller settings. See
page 80.
The controller is reset by
Watch Dog timer
The Watch Dog timer has started.
Event Action