3M 965DPS Modem User Manual


 
129
If the initialization is successful, the Wideband
results screen will appear.
Check the test lead hookup for the 965DSP and
the FED. The Autotest can be run with the FED
connected directly to the 965DSP to determine if
the cable hookup is causing the problem. Press the
[Enter] key to return to the Auto Menu screen.
For the FED II with Pair 2 selected, the 965DSP
performs another test to verify communication on
Pair 2. If this screen is displayed, the 965DSP could
not communicate on Pair 2. If you would like to
retry this connection press [Tab]. If retry does not
work, move the leads to Pair 1 and press [Enter] to
abort and return to the Auto Menu screen.
If the green test lead is not properly connected, the
following screen will be displayed.