Agilent Technologies Z5623A Network Router User Manual


 
3-18 Agilent Technologies Z5623A Option H48
Using the Network Analyzer to Control the Test Set
Disaster Recovery
Figure 3-15 GPIB Device Disabling Message
Step 10. Right
-click on the “AT-GPIB/TNT” icon once again. A menu will pop up.
Step 11. Click Enable on the menu.
Step 12. Close the Device Manager window by clicking on the X in the upper
right-hand corner of the window.
Step 13. Close the System Properties window by clicking on the X in the upper
right-hand corner of the window.
The recovery procedure is now complete. To resume control of the test
set, perform the procedure described in “Preparing the Analyzer to
Control the Test Set” on page 3-2.
Malfunctioning Network Analyzer
Symptoms
Any abnormality in the network analyzer’s behavior indicates a
malfunction of the analyzer. An example would be the failure of icons to
appear on the screen of the analyzer.
Recovery Procedure
Perform a Hard Reset on the PNA Series network analyzer as follows:
First, make sure the power is on (indicated by the power switch being
green). Next, hold the power switch in for about 20 seconds, or until the
color of the switch changes from green to orange. Release the switch,
then press it again and release it immediately.