Allied Telesis AT-X510DP-52GTX Switch User Manual


 
Chapter 9: Cabling the Networking Ports
114
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 70 on page 114.
Figure 70. Installing an SFP or SFP+ Transceiver
Note
If you are ready to attach the fiber optic cable to the transceiver,
continue with the next step. Otherwise, repeat steps 1 to 4 to install
the remaining SFP or SFP+ transceivers in the line cards.
5. Remove the dust cover from the transceiver, as shown in Figure 71.
Figure 71. Removing the Dust Cover from an SFP or SFP+ Transceiver
S2
/28
S1/27
26
25
CON
SO
LE
SFP+
2676
S2/28
S1/27
26
25
CON
SO
LE
SFP+
2677