Allied Telesis AT-X510DP-52GTX Switch User Manual


 
Chapter 4: Installing the Switch and its Power Supplies
76
Figure 38. Switch Initialization Messages (Continued)
Assigning Active Workload to HA processes:
hsl, nsm, rmond, sflowd, vrrpd, irdpd, lacpd
lldpd, loopprotd, mstpd, authd, epsrd, imi, imiproxyd
Received event network.activated
Loading default configuration
Warning: flash:/default.cfg does not exist, loading factory defaults.
..
done!
Received event network.configured
awplus login: