Installation 21
Emerson Energy Systems Rectifier 200I/48NT5C05C Installation and User Manual
in the concrete floor, the secondary anchor locations may be used. An
optional cabinet isolation kit is available consisting of four anchor
bushings and a base pad. If this kit is installed, place the pad on the floor
and the bushings on the anchors, and position the cabinet on top.
Figure 3 - Anchoring the cabinet
+
+
600 mm
(23.56 po.)
520 mm
(20.42
po.)
5
9
0
m
m
(
2
3
.
1
3
p
o
.
)
526 mm
(20.68 po.)
SECONDARY LOCATION
FOR FLOOR ANCHORS
PRIMARY LOCATION
FOR FLOOR ANCHORS
Procedure 2 - Installing a rectifier in a cabinet
Step Action
1
Loosen and remove the screws securing the mounting brackets to
each side of the rectifier.
2
Reposition and secure the mounting brackets to the holes located
nearest the front of the rectifier, on each side of the rectifier.
3
Remove the blank panel from the cabinet and put the self tapping
screws in a secure location, for future use.
continued