Hardware Preparation and Installation
MVME3100 Single Board Computer Installation and Use (6806800M28C)
22
1.2.2 Unpacking Guidelines
Unpack the equipment from the shipping carton. Refer to the packing list and verify that all
items are present. Save the packing material for storing and reshipping of equipment.
If the shipping carton is damaged upon receipt, request that the carrier’s agent be present
during the unpacking and inspection of the equipment.
1.3 Declaration of Conformity
For Declaration of Conformity, refer MVME3100 Series Declaration of Conformity.
1.4 Configuring Hardware
This section discusses certain hardware and software tasks that may need to be performed
prior to installing the board in a chassis.
To produce the desired configuration and ensure proper operation of the MVME3100, you may
need to carry out certain hardware modifications before installing the module.
Connect any other equipment you will be using Connecting to Peripherals on page 31
Verify the hardware is installed. Completing the Installation on page 33
Table 1-1 Startup Overview (continued)
What you need to do... Refer to...
Damage of Circuits
z Electrostatic discharge and incorrect installation and removal of the product can
damage circuits or shorten their life.
z Before touching the product make sure that your are working in an ESD-safe
environment or wear an ESD wrist strap or ESD shoes. Hold the product by its edges and
do not touch any components or circuits.