Gateway 840 VT-100 Power Supply User Manual


 
183
Controller events
www.gateway.com
Resync Started A stripe synchronization of a
RAID 5/50 set has started.
This will be done when a
controller fails or when
powered off during a write.
A controller fails or
is powered off
during a RAID
5/50 write
operation.
No action
necessary.
Resync Completed A stripe synchronization of a
RAID 5/50 set has
completed.
A controller fails or
is powered off
during a RAID
5/50 write
operation.
No action
necessary.
UPS Failure This indicates that an
attached UPS (if configured)
has failed.
UPS has been
disconnected or
communications
with the UPS has
failed.
Check the UPS
monitoring
connections.
Check the UPS, if
necessary replace
it.
UPS OK This indicates that an
attached UPS (if configured)
is functioning correctly.
UPS is connected. No action
necessary.
Voltage Error:
Monitored
Voltage: xx.yy
V
This indicates that the
specified voltage has
exceeded limits. This is a
serious error, and should be
reported to Technical
Support.
Voltage regulator
hardware failure.
Enclosure 5V or
12V problem in the
power supply.
Replace the
controller. Contact
Technical Support.
Replace the
defective power
supply.
Controller Event Messages Description Cause Action