•
Program status
•
Program usage
•
File cross-referencing
•
Job cross-referencing
33.2.2.1 Product Highlights
IBM OPTI-AUDIT for VSE Version 1.1.0:
•
Captures and builds an inventory of all programs running on your VSE
system
•
Monitors the execution of batch jobs extracting job/program/file
cross-referencing information
•
Provides a source scanning facility for COBOL
•
Produces a variety of reports for the year-2000 conversion
33.2.2.2 Product Details
•
Performs a static analysis of VSE libraries.
− Libraries not required can be excluded
− Creates a central repository (database) of PHASE related information,
such as, phase name and usage tally.
•
Monitors the execution of batch jobs marking the phases as ′active′ and
logging phase, job and file (for example, data set) cross-referencing
information.
•
Functions available through batch job submission:
− Flag phases as ′Y2K READY′, including the facility to remove this setting.
− Scanning of COBOL source code for date related information
- Output is divided into four reports:
•
REPORT 1 - Suspect Verb analysis (looks for date suspect
COBOL verbs, for example ceedate..)
•
REPORT 2 - Suspect Variable Analysis (looks for common
variables used as date fields, for example, 9(6), and X(6))
•
REPORT 3 - Suspect Variable Scan (scan for USAGE of variables
identified in reports 1 and 2)
•
REPORT 4 - Generic Search Results (uses a software supplied
table of character strings and returns matching lines of code)
User-supplied variable names can be included or excluded from
the reports as required.
- Opti-analyzer -- generates an analysis of a batch phase. It identifies
each module called, providing a statistical break-down of all
supervisor calls. Specific date-related calls such as GETIME (SVC 34)
can be identified.
- Reports
Database (phase) - four reports are available:
Chapter 33. Conversion Services and Tools 521