IBM OS/390 Time Clock User Manual


 
7
Training personnel to work with the OS/390 system.
8
Planning and installing the OS/390 system products.
9
Developing standards for application conversion that reflect such things as
naming conventions to be used in the new OS/390 system environment.
10
Collecting all VSE source materials and presenting same to the conversion
process.
11
Translating VSE programs to OS/390 programs.
12
Converting JCL.
13
Transferring data files from VSE to OS/390.
14
Testing each converted application under OS/390.
15
Documenting and preparing run books and operational procedures.
16
Implementing the production workload under OS/390.
3.2.4 Milestone Events
Within each migration, certain activities should be identified as key activities, the
attainment of which can signal significant progress (or the lack of attainment, a
schedule slippage). These activities are typically called milestone events or just
milestones. Each customer should identify the milestones most important in their
migration.
The following are some suggested VSE to OS/390 migration milestones:
Migration Plan completed, reviewed, and approved.
VSE software inventory completed.
All vendor support committed.
Essential education completed.
Necessary hardware installed.
Installation of OS/390 and related products completed.
Initial OS/390 IPL performed.
Pilot conversion completed.
Each major applications successful conversion.
Stress/Production tests completed.
Operator education and Run Books completed.
Production criteria attained.
Production implementation initiated.
Once milestones are defined, periodic checkpointscan be scheduled to
monitor successful milestone completion; that is, project progress.
48 VSE to OS/390 Migration Workbook