46
4-3. Operation Timing
• A specific function of image stabilization control is carried out as required according to
the situation.
✽ 1: When 1,000 printed pages have been produced after A has been performed last.
✽ 2: When 200 printed pages have been produced after A and B have been performed last.
Operating Timing Processing
• When a new Image Transfer Belt
is detected
• When a new Drum Cartridge or
Toner Cartridge is detected
• When the environment changes
• When 1,000 printed pages have
been produced*1
A
• Ds correction control -> LED intensity
adjustment control -> Belt surface reflec-
tion factor measurement control -> Solid
image toner amount control -> Laser
intensity adjustment control ->
γ correc-
tion control
• When 200 printed pages have
been produced*2
B
• Solid image toner amount control ->
Laser intensity adjustment control ->
γ
correction control
• When the processing is com-
manded from the Control Panel
C
• γ correction control