Nortel Networks 425 series Switch User Manual


 
Managing and maintaining the system 359
Configuring the Nortel SNAS scheduler
The Nortel SNAS scheduler allows to run automated system maintenance
tasks at scheduled intervals. To configure the Scheduler tasks, use the
following command:
/cfg/scheduler
The Scheduler menu appears.
The Scheduler menu includes the following options:
/cfg/scheduler
followed by:
add Adds task to the scheduler.
del <task number> Deletes task from scheduler.
task number—specify the task number.
list Lists schedule time details for the following:
Id
Task
Scheduled Time
Comments
ena Enables the scheduler task.
dis Disables the scheduler task.
Addition of a scheduled task
To add a scheduled task, use the following command:
/cfg/scheduler/add
This includes the following fields:
/cfg/scheduler/add
followed by:
task Specifies the scheduled task. Values:
ptcfg | reboot | starttrace | stoptrace |
selftest | upgrade | export
day of week Select the day of the week. You can select
the multiple days in a week. The value
ranges from 0 to 6.(Sunday = 0) and [*]:
1-5
Nortel Secure Network Access Switch
Using the Command Line Interface
NN47230-100 03.01 Standard
28 July 2008
Copyright © 2007, 2008 Nortel Networks
.