Nortel Networks 555-4001-135 Server User Manual


 
180 Maintenance
553-3001-358/555-4001-135 Standard 02.00 July 2006
System Maintenance:
SM
System Test: ST
To perform system component tests enter:
i – perform in-service tests that do not disrupt service
o – perform out-of-service tests
Maintenance Report Browser: MR
Browse maintenance reports by date. For more information, see “CLI
Maintenance (Error) Report” on page 210.
Ping Test:
Enter a computer’s IP address to test IP connectivity with this computer.
Short Connection Report: SC
Browse short connection reports by date (see “CLI Short Connection
Report” on page 197).
Database Archive: AR
Backup the customer database (see “Backup” on page 134).
Database Restore: RE
Restore the customer database (see “Restore” on page 192).
Card Restart: CR
Restarts ICB card and begins software reload.
Message Analysis Tool: SHO
Prints information about an error message that is entered (see “Error
message procedures” on page 184).
Message Filtering: ERR
Enables the filtering of error messages (see “Configure error message
filtering” on page 186).
Data Conversion: CONVERT
Copies the data from the upper PCMCIA, converts to ICB Release 4
format, and stores it in the lower PCMCIA.
Protected administration:
PA
Password Editor: PS
Edit passwords (see “Appendix A: Password security” on page 223).
Functionality Upgrade: FU
Performs a functionality upgrade.
The system prompts for the number of ports and for the keycode that must
be entered in three rows of eight characters each. The system will then
prompt for which feature (can be either advanced or basic).
Software Upgrade: SW
Performs a software upgrade.
The system first prompts for the source: upper socket or FTP. If FTP is
entered, the system then prompts for IP address, path to file, login, and
password.
Administrator BUI Reset: AB
Reset passwords to the default (that is, 000000) of all administrators that
use the BUI.
Table 46
ICB CLI command summary (Continued)
Menu and command Items and commands