Panasonic CF-19CDBAXVM Laptop User Manual


 
9-21
9.2.7. Setting the Pad PCB and SW PCB
1. Attach both the SW PCB and the Operation Sheet to the
Cabinet.
2. Connect the 3 Cables to the 3 Connectors.
(CN800,CN805,CN807)
3. Fix the Pad PCB using the 4 Screws. <N1>
Note:
Tighten the Screws in the numbered order (No1 to
No4).
Screws <N1> : DFHE5025XA
SW PCB
Operation Sheet
<N1>:No.3
Pad PCB
Connector(CN807)
Connector(CN805)
<N1>:No.2
<N1>:No.1
<N1>:No.4