Preparation for Installation 4-33
II L 00
6) Install the Container Stacker 1 to the Container Stacker 2. The screw is the thing of the
temporary stopping.
7) In order to adjust the height of Container stacker, turn 180 degrees each of four leveling bolts,
and satisfy the following conditions, and bolt the screw of a temporary tight.
(1) When Front cover R is shut and it looks into the space between Container stacker 2
and Container stacker 1 from a front side, the height of the Frame’s projection of
Container stacker and the Guide plate U’s projection is the same.
[Note] As for the way of opening front cover L, refer to the item 3.3.
M4x12 screws
M4x12 screws
Container stacker 1
M4x12 screws
Container stacker 2
Frame projection part
Stacker frame
Leveling bolt
Guide plate U
Projection Projection
Same height
Connection part details
Level Meter
Front cover L
Front cover R