Ricoh 70E Printer User Manual


 
Preparation for Installation 4-48
II L 00
22) Connect the connector of cables to Container Stacker and Transit Pass Unit Type DDP.
(1) Disconnect the Signal Cable from EDxxx PK in the Transit Pass Unit Tyoe DDP.
(white 8pin connector and black 22pin connector)
(2) Connect the Signal Cable(CS) to EDxxx P/K of the Transit Pass Unit Type DDP.
(white 8pin connector and black 22pin connector)
(3) Pass the three cables through the Hole of Container Stacker and Transit Pass Unit Type
DDP from Transit Pass Unit Type DDP to Container Stacker.
- AC cable (white 2pin connector) x2
- Signal cable(CS) (black 20pin (big size) / black 20pin (small size) / black 14pin
/ black 22pin connector)
- GND cable
(4) Pass the one cable through the Hole of Container Stacker and Transit Pass Unit Type
DDP from Container Stacker to Transit Pass Unit Type DDP.
- FNS IF cable (white 4pin / black 20pin connector)
(5) Disconnect the FNS I/F cable from J681 connector on the ST board. (Disconnection 1)
Connect the Signal Cable(CS) to the connector on the ST board as follow. (Connection 1)
- black 20pin connector (big size) -> J681
(6) Pass the one cable through the Hole of Printer and Container Stacker from Container
Stacker to Printer.
- Signal cable(CS) (black 20pin (small size) / black 14pin connector / black 22pin
connector)
(7) Remove the OCxxx PK.
(8) Connect the Signal Cable(CS) to the connector on the CP board as follows.
(Connection 2)
- black 22pin connector -> between J717 and the original cable
- black 20pin connector (small size) -> J747(another side is not be connected)
- black 14pin connector -> J791(another side is not be connected)
(9) Attach the OCxxx PK.
(10) Connect the AC cable (white 2pin connector).
Then, another side connector of AC cable is not used.
(Connection 3)
(11) Mount the FG cable on Container Stacker frame by using M4 screw.
(Connection 4)
(12) Connect the FNS IF cable to the white 4pin connector in the Transit Pass Unit Type DDP.
(Connection 5)
(13) Switch on No.5 of SW1 on the CP board of the Printer.
(14) Switch on No.8 of SW1 on the CP board of the Printer.
(15) Switch on No.6 of SW2 on the CP board of the Printer.
Note 1) Green flat cable (20pin) of FNS IF cable in the Container Stacker and Transit Pass
Unit Type DDP is not used.
01