Smart Technologies 600i3 Projector User Manual


 
38 | CHAPTER 5 – REMOTELY MANAGING YOUR SMART BOARD 600I3 OR
SBD600I3 INTERACTIVE WHITEBOARD SYSTEM
UF55/UF55w Programming Commands
Powerstate Controls
The UF55/UF55w projector responds to commands only at certain power levels and
times. There are four projector power states:
•Idle
Powering (startup)
On (operating)
Cooling (idle)
The embedded firmware program coordinates command sequencing and is capable
of buffering up to 127 commands. In each power state, the commands are buffered
until the system can process them. The ? command will list all available commands for
the current powerstate.
IMPORTANT
The system buffer can delay response times. Response times vary.
Command Inventory
The UF55/UF55w projector responds to the commands in the tables on the
following pages.
CAUTION
Cycling power to the projector repeatedly can lock or damage your interactive
whiteboard system. After you turn off the system, allow at least 15 minutes
for cooling before sending the On command to start the system.
Check your entries carefully before entering your commands.
NOTES
Commands aren’t case sensitive.
Type commands exactly as they appear in the left column of the tables.
Press ENTER after typing each command.
After the projector executes a command, it generates a response. There are
two ways to program the command sequence to turn on the system, wait for
the powering cycle to finish and select an input source:
Allow the ECP to sequence the commands
Control the sequence programmatically